ASSEL GROUP · Technical guides

How to organise containment records

Containment requires material segregation against defined criteria and a clear record of what has been checked and which decisions remain open.

Quality and inspection

Define the affected material

Identify part references, batches, locations and the deviation that triggered the activity. Distinguish material awaiting inspection, inspected material and non-conforming material. Containment limits exposure to an issue; it does not replace root-cause analysis or corrective action.

Establish a work instruction

Describe what to check, the acceptance criterion, how to identify results and when to escalate uncertainty. Link the instruction to its revision and approval. If the criterion changes during the assignment, record when it takes effect and agree whether previously checked material needs another inspection.

Maintain a quantity balance

A tracking record may include date, shift, reference, batch, inspected quantity, conforming quantity, non-conforming quantity and outstanding items. Avoid double-counting material returned for another inspection. Explain differences between inputs, results and outputs before closure.

Record issues and decisions

Record defects and questions requiring a responsible person’s decision. Identify who authorises disposition and which material remains on hold. Where photographs are permitted, link them to the corresponding record and share them through an authorised channel.

Close against agreed criteria

The closing record should state completed scope, results and open items. Ending containment and releasing product require the designated responsible person’s decision under the agreement. ASSEL GROUP can assess inspection, sorting and follow-up support within the scope defined for each project.

Request a technical assessment

Request a technical assessment →